Loading publications…
The last 5 uploaded publications
Low cycle fatigue behaviour of wire arc additively manufactured ER70S-6 steel
Liang Zong, Wanquan Fang, Cheng Huang, Zhongxing Wang, Leroy Gardner (2023). Low cycle fatigue behaviour of wire arc additively manufactured ER70S-6 steel. , 176, DOI: https://doi.org/10.1016/j.ijfatigue.2023.107910.
Article116 days agoExperimental study and constitutive modelling of wire arc additively manufactured steel under cyclic loading
Zhongxing Wang, Yuhang Hou, Cheng Huang, Qinghua Han, Liang Zong, Man-Tai Chen, Kailai Deng, Leroy Gardner (2023). Experimental study and constitutive modelling of wire arc additively manufactured steel under cyclic loading. , 213, DOI: https://doi.org/10.1016/j.jcsr.2023.108420.
Article116 days agoThe Overall Optimization of Djoué Composite Steel-Concrete Bridge in the Congo (Brazzaville) National Road One Phase- II Project
Rui Hui Jia, Yun Wei Chen, Yuan Qing Wang, Liang Zong, Jun Li, Xi Min Zhang (2012). The Overall Optimization of Djoué Composite Steel-Concrete Bridge in the Congo (Brazzaville) National Road One Phase- II Project. , 256-259, DOI: https://doi.org/10.4028/www.scientific.net/amm.256-259.1520.
Article76 days agoThe Optimization Design Analysis of Loukouni Bridge in the Republic of Congo
Long Ying Zhang, Liang Zong, Yuan Qing Wang, Jun Li (2012). The Optimization Design Analysis of Loukouni Bridge in the Republic of Congo. , 256-259, DOI: https://doi.org/10.4028/www.scientific.net/amm.256-259.1665.
Article76 days ago